Work / 01
Projects
Case studies in product development, full-stack delivery and technical modernisation.
3 projects

2025SaaSMVP
Nordwind
A B2B dashboard that turns scattered energy data into a basis for decisions — from workshop to pilot in six weeks.
- Time to pilot
- 6 weeks
- Less manual reporting
- 40%

2024Language: GermanKMUDigitalisierung
Werkstatt
Vom Papierauftrag zum transparenten Betrieb: ein schrittweise eingeführtes Auftrags- und Terminsystem für einen mittelständischen Handwerksbetrieb.
- Weniger Terminkonflikte
- 25 %
- Gesparte Zeit pro Tag
- 2 h

2025Design SystemPerformance
Atlas
A design system that turned a patchwork of components into a shared language — and made the frontend measurably faster.
- Smaller JS bundle
- 42%
- Lighthouse performance
- 62 → 96
Tech-Karl
Have a project in mind?